Energy

Projects

Project Properties

• 10 kW 131 km 2 line power transmission line
• 234 km 110 kW power transmission line and switchboards
• Construction and operation of 234 km railway signaling

Location

Serhatkaya – Türkmenistan

Project Properties

Drilling was terminated at 1200 metres, and the final temperature reached was 54,25oo’dir.

Our site is in the area defined as Ayaş-Beypazarı and Kazan-Mürted, with a specific geological structure, with the drilling carried out, Nata carried out a first, and revealed the lithological and geothermal potential of this unknown area geologically.

Lokasyon

Ankara – Eryaman