Construction Projects



Project Properties
1400 mm diameter micro tunnel with 4.172 m Pipe – jacking technique
Employer
İSKİ
Location
Asya Yakası – İstanbul
Begin and due date
June 2006 – December 2013



Proje Özellikleri
- 60.000 m3’lük reinforced concrete water tank
- Supply and laying of 2200 mm inner diameter, 36.000 m length spiral welded steel pipe
- Supply and installation of reinforced concrete structures, machinery fittings, equipment and cathodic protection
Employer
ASKİ
Location
Ankara
Begin and due date
December 2000 – July 2004



Project Properties
- Pumps required for pump stations: 500 lt / sec (20 Vertical Spindle Pumps) 1000 lt / sec (40 Horizontal Spindle Pumps)
- Electric motors: 1200 kW (20 units), 1600 kW (30 units), 2000 kW (10 units)
- Supply of Electrical supplies and equipment, SCADA system
- Installation and assembly of machinery, fixtures and fittings
- Pump stations, concrete drilling depot(7.500 m3, 15.000 m3, 30.000 m3)
- Construction work of water intake structure, valves, suction and discharge chambers on line
Employer
ASKİ
Location
Ankara
Begin and due date
June 2007 – May 2008


Project Properties
Fore Construction work consisting of all infrastructure work including piling system, prestressed precast beams, variable traffic sign, traffic signaling system, all tunnel and road lighting, LV / MV power displacement works, telecom infrastructure displacement (including copper cable, fiber optic cable, cable TV works), natural gas displacement (low and medium pressure) works, landscaping, road (including pavement and curbs) and concrete bridge intersection.
Employer
Belbeton Beton Elemanları San. ve Tic. A.Ş.
Location
Çankaya – Ankara
Begin and due date
26 August 2006 – 4 April 2007